Fuel tank valve structure controlling emission gas in hybrid vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8578914
APP PUB NO 20120073548A1
SERIAL NO

12949509

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A fuel tank valve structure controlling emission gas in a hybrid vehicle may include a housing having one side connected with a fuel tank and the other side connected to a canister, a check valve mounted to the housing and opening or closing a first fluid passage connected between the canister and the fuel tank, a solenoid valve apparatus selectively connected with the check valve to open or close the first fluid passage to adjust an internal pressure of the fuel tank, a fuel limit vent valve apparatus mounted to the housing and selectively fluid-connecting to a space formed between the check valve and the fuel limit vent valve apparatus in the housing, and a relief valve mounted to the housing and selectively fluid-connecting the fuel tank with the canister through a second fluid passage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KIA MOTORS CORPORATION12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797
HYUNDAI MOTOR COMPANY12 HEOLLEUNG-RO SEOCHO-GU SEOUL 06797
UNICK CORPORATION90 SEOBU-RO 179BEON-GIL JINYEONG-EUP GYEONGSANGNAM-DO GIMHAE-SI 50870

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lee, Chang-Hoon Busan-shi, KR 83 558
Lee, Sung-Won Hwasung-shi, KR 85 1656

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00