Method and device for the automated manufacture of at least one elongate composite material part with one or more layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8574388
APP PUB NO 20120006475A1
SERIAL NO

13254586

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and device for automated manufacture of an elongated composite material part having at least one layer. The method includes depositing, by unrolling onto a mold, in a first direction, along the mold, an assembly having a composite material layer separably attached to a substrate tape, and forming and compacting part of the assembly onto the mold in the first direction. The assembly is partially shaped to the shape of the mold, and then a remaining portion of the assembly is formed and compacted in a second direction, opposite the first direction, to shape the assembly completely to the shape of the mold. Then the assembly is separated, by peeling the substrate tape from the composite material layer that is secured to the mold, by unrolling the substrate tape in the second direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONSTRUCTIONS INDUSTRIELLES DE LA MEDITERRANEE - CNIM35 RUE DE BASSANO PARIS 75008

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Colombo, Denis Sanary sur Mer, FR 2 38
Mailhot, Dominique La Seyne sur Mer, FR 1 23
Micheaux, Dominique Sanary sur Mer, FR 6 228
Valibouse, Pierre Le Revest, FR 2 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 5, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00