Centralized route calculation for a multi-hop streetlight network

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8570190
APP PUB NO 20090066540A1
SERIAL NO

12231929

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and various apparatus and methods performed therein configured for calculating routes touching and monitoring and controlling streetlights includes a multiplicity of streetlight controllers and a local coordinator. Each streetlight controller includes a switch operative to control the operation of a load, a sensor operative to monitor the operation of the load, a processor, and a radio transceiver operative to receive control data and transmit data associated with the streetlight controller. The local coordinator includes a coordinator radio transceiver, and a coordinator processor operative to maintain a list of the multiplicity of streetlight controllers and, cooperatively with the coordinator radio transceiver, exchange messages with any of the multiplicity of streetlight controllers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LED ROADWAY LIGHTING LTD115 CHAIN LAKE DRIVE HALIFAX B3S 1B3

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamidi, Jam Victoria, CA 1 50
Lightbody, Simon H Victoria, CA 41 3818
Marinakis, Dimitri Duncan, CA 3 119
Redivo, Marcus North Saanich, CA 1 50
Varga, Zoltan Victoria, CA 21 178

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00