Hydrocarbon compound synthesis reaction unit and operating method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8569387
APP PUB NO 20110190403A1
SERIAL NO

12998216

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrocarbon compound synthesis reaction unit which synthesizes a hydrocarbon compound by a chemical reaction of a synthesis gas including a hydrogen and a carbon monoxide as the main components, and a slurry having a solid catalyst suspended in liquid hydrocarbons, the hydrocarbon compound synthesis reaction unit is provided with: a reactor which contains the slurry inside, into which the synthesis gas is introduced, and from which the gas after the reaction is discharged from the top thereof; an internal separation device provided inside the reactor to separate the catalyst and the synthesized liquid hydrocarbons in the slurry; and an external separation device provided outside the reactor to separate the catalyst and the liquid hydrocarbons in the slurry which is extracted from the reactor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
COSMO OIL CO LTD1-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 105-8528
JAPAN OIL GAS AND METALS NATIONAL CORPORATION2-10-1 TORANOMON MINATO-KU TOKYO 105-0001
JX NIPPON OIL & ENERGY CORPORATIONCHIYODA-KU TOKYO 100-8162
JAPAN PETROLEUM EXPLORATION CO LTDTOKYO JAPAN
NIPPON STEEL ENGINEERING CO LTD5-1 OSAKI 1-CHOME SHINAGAWA-KU TOKYO 141-8604
INPEX CORPORATION5-3-1 AKASAKA MINATO-KU TOKYO 107-6332

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Yuzuru Tokyo, JP 19 44
Morita, Kentarou Tokyo, JP 6 14
Murata, Atsushi Tokyo, JP 69 337
Onishi, Yasuhiro Tokyo, JP 37 680
Wakamura, Osamu Tokyo, JP 2 3
Yamada, Eiichi Tokyo, JP 74 1001

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00