System and method for controlling engine revolutions for hybrid construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8567549
APP PUB NO 20110028268A1
SERIAL NO

12819495

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method for controlling engine revolutions for a hybrid construction machine is provided. The system for controlling engine revolutions for a hybrid construction machine, including an engine, a hydraulic pump which is driven by the engine to drive a hydraulic actuator with discharged hydraulic fluid, a motor-generator which is driven by the engine to generate electricity and to drive the hydraulic pump as a motor supplementing the engine, an energy storage device which is charged with electric energy generated by the motor-generator and which supplies the electric energy for motor operation of the motor-generator, a torque detection means for detecting an output torque of the hydraulic pump that is required to drive the hydraulic actuator, and a hybrid control means for controlling the motor operation of the motor-generator so as to supplement the engine output if the change of the output torque of the hydraulic pump detected by the torque detection means exceeds a predetermined level and it is determined that an engine revolution drop will occur.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VOLVO CONSTRUCTION EQUIPMENT HOLDING SWEDEN AB631 85 ESKILSTUNA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jo, Jung Sun Changwon-si, KR 4 78
Jung, Ahn Kyun Changwon-si, KR 4 78
Kang, Jong Min Changwon-si, KR 9 87
Kim, Jae Hong Gimhae-si, KR 251 2131
Lee, Chun Han Gimhae-si, KR 5 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00