Energy recovery system in a gas compression plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8567184
APP PUB NO 20100272588A1
SERIAL NO

12765569

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system for recovering energy in a gas compression plant. The system comprises at least one centrifugal compressor configured to suck the gas, at a certain inlet pressure, from a suction conduit and configured to deliver the gas, at a certain outlet pressure that is greater than an inlet pressure, through a delivery conduit The system also includes at least one gas recirculation system configured to redirect the gas from the delivery conduit to the suction conduit when the gas flow rate entering into the compressor is below a certain limit value. In the portion of the plant arranged downstream of the compressor, at least one turbo-expander and at least one valve are installed in parallel so that they cooperate with each other and are controlled by electronic devices so as to protect the compressor and to produce useful energy during recirculation mode.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NUOVO PIGNONE S P AVIA FELICE MATTEUCCI 2 FIRENZE I-50127

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barabino, Alessandra Genoa, IT 1 11
Ferroni, Renato Florence, IT 1 11
Mariotti, Gabriele Lucca, IT 15 87
Scotti, Del Greco Alberto Florence, IT 10 27

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 29, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00