Relay, control circuit, and method for controlling control circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8564388
APP PUB NO 20130033345A1
SERIAL NO

13641412

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The relay (KM) has at least first and second contact points (a1, a2), the states of which are switched from an open state to a close state by the drive of an electromagnet (32). The first and second contact points (a1, a2) switch the states between the open state and the close state by enabling movable contact pieces (31) to move with respect to respective fixed contact pieces (30) by using a power transmission mechanism (21) movable by the drive of the electromagnet (32). The first and second contact points (a1, a2) are set so that the second contact point (a2) is switched to the close state after the first contact point (a1) is switched to the close state and the first contact point (a1) is switched to the open state after the second contact point (a2) is switched to the open state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL UNIVERSITY CORPORATION NAGAOKA UNIVERSITY OF TECHNOLOGY1603-1 KAMITOMIOKA-MACHI NAGAOKA-SHI NIIGATA-KEN 940-2188

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Futsuhara, Koichi Niigata, JP 56 503
Hirao, Yuji Niigata, JP 4 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 22, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00