Solar simulator and a measuring method of a multi-junction photovoltaic devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8558536
APP PUB NO 20110127992A1
SERIAL NO

13054744

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solar simulator and a measurement method of the multi-junction photovoltaic device is provided. The measurement method includes following processes. The process that the halogen lamp emits a flash and a top of a light pulse wave shape is controlled to be flat. The process that the xenon lamp once or plural times emits a flash which has the flat top and is shorter pulse than the flat area of the halogen lamp flash while the top of a light pulse shape of the halogen lamp flash is flat. The process that the flashes from the halogen lamp and the xenon lamp is irradiated to the photovoltaic device as the measurement object, and during the emission of the flash from the xenon lamp, the load of the photovoltaic device is controlled and the current and the voltage generating therefrom are measured at single point or plural points.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NISSHINBO HOLDINGS INCTOKYO 103-8650

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shimotomai, Mitsuhiro Okazaki, JP 14 215
Shinohara, Yoshihiro Okazaki, JP 8 130

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00