Pulverized coal concentrator and pulverized coal burner including the concentrator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8555795
APP PUB NO 20120006238A1
SERIAL NO

13257584

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pulverized coal concentrator for a pulverized coal burner, the concentrator is fixedly arranged inside the pulverized coal burner and comprises a front part (102) and a rear part (101), wherein the front part (1020 is designed as a bowl-shaped structure, for guiding and concentrating an air-pulverized coal flow, and the rear part (101) is designed as a cylinder-shaped structure, for maintaining a proper extension of the dense phase zone of the air pulverized coal flow. Also a pulverization coal burner is provided comprising the pulverized coal concentrator, in particular an internal combustion-type pulverized coal burner. The pulverized coal concentrator increases the adaptability of burner to coal quality, air velocity and pulverized coal density.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YANTAI LONGYUAN POWER TECHNOLOGY CO LTD264006 NO 2 BAIYUNSHAN ROAD YANTAI ECONOMIC AND TECHNOLOGICAL DEVELOPMENT ZONE SHANDONG PROVINCE YANTAI CITY SHANDONG PROVINCE 264006

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Changye Yantai, CN 1 7
Cui, Xingyuan Yantai, CN 3 15
Gong, Zeru Yantai, CN 2 11
Li, Yi Yantai, CN 917 5421
Liu, Peng Yantai, CN 833 6111
Yang, Jiaju Yantai, CN 1 7
Zhang, Chaoqun Yantai, CN 9 21
Zhang, Guangquan Yantai, CN 17 12
Zhang, Yubin Yantai, CN 20 51

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00