Method and device for separating a mixture of at least hydrogen, nitrogen, and carbon monoxide by cryogenic distillation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8555673
APP PUB NO 20100071411A1
SERIAL NO

12519990

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a method and apparatus for separating a mixture containing carbon monoxide, nitrogen and hydrogen by cryogenic distillation in a separation system which includes a denitrification column and at least another column. The method can include separating the mixture in order to obtain a fluid enriched with carbon monoxide and containing nitrogen, separating the fluid in the denitrification column, pressurizing the carbon monoxide flow from the column in a compressor up to a high pressure, collecting a fraction of carbon monoxide flow to be used as a product, expanding an amount of the high-pressure carbon monoxide flow in a valve prior to supplying it to the denitrification column, and varying the flow expanded in the valve according to re-boiling needs of the denitrification column.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
L'AIR LIQUIDE SOCIETE ANONYME POUR L'ETUDE ET L'EXPLOITATION DES PROCEDES GEORGES CLAUDEPARIS FRANCE PARIS PARIS

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Darde, Arthur Paris, FR 53 389
Hernandez, Antoine Le Plessis-Trevise, FR 31 96

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00