Method for manufacturing a conductive substrate structure with conductive channels formed by using a two-sided cut approach

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8555492
APP PUB NO 20120096710A1
SERIAL NO

13338410

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conductive substrate structure includes a substrate unit, a conductive pad unit, and a conductive layer unit. The substrate unit has a top surface, a bottom surface, two opposite lateral surfaces, and a front surface. The conductive pad unit has at least two first conductive pads separated from each other and disposed on the top surface, and at least two second conductive pads separated from each other and disposed on the bottom surface. The conductive layer unit has at least two first conductive layers formed on the front surface and respectively electrically connected to two front sides of the two first conductive pads, and at least two second conductive layers respectively formed on the two opposite lateral surfaces and respectively electrically connected to two opposite lateral sides of the two second conductive pads. The two first conductive layers are respectively electrically connected with the two second conductive layers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HARVATEK CORPORATIONNO 18 LANE 522 SEC 5 CHUNG HWA ROAD HSINCHU CITY 30094

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Jack Miaoli County, TW 182 1931
Hsiao, Sung-Yi Miaoli County, TW 19 39
Wang, Bily Hsinchu, TW 186 1666

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 15, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00