Apparatus, system and method for a UPS

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8552584
APP PUB NO 20130076132A1
SERIAL NO

13453509

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one aspect of the invention, a UPS includes an input configured to be coupled to an AC power source, a DC power source, an output configured to receive power from at least one of the AC power source and the DC power source, a first switched receptacle outlet coupled to the output and configured to be coupled to a first electrical load and a second receptacle outlet coupled to the output and configured to be coupled to a second electrical load. According to some embodiments, the UPS also includes a control unit configurable to provide a first configuration associated with the first switched receptacle outlet, where the first configuration is employed by the control unit to control a connection of the first switched receptacle outlet to the output independent of the second receptacle outlet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SCHNEIDER ELECTRIC IT CORPORATION70 MECHANIC STREET FOXBORO MA 02035

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cohen, Daniel C Newton, US 31 809
Colucci, David A Lynnfield, US 19 851
Melanson, Mark R Chelmsford, US 18 636
Spitaels, James S Shrewsbury, US 49 1735

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00