Narrow PSD hydraulic cement, cement-SCM blends, and methods for making same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8551245
APP PUB NO 20130192493A1
SERIAL NO

13798756

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Hydraulic cements, such as Portland cements and other cements that include substantial quantities of tricalcium silicate (C3S), dicalcium silicate (C2S), tricalcium aluminate (C3A), and/or tetracalcalcium alumino-ferrite (C4AF), are particle size optimized to have increased reactivity compared to cements of similar chemistry and/or decreased water demand compared to cements of similar fineness. Increasing hydraulic cement reactivity increases early strength development and release of reactive calcium hydroxide, both of which enhance SCM replacement and 1-28 day strengths compared to blends of conventional Portland cement and one or more SCMs, such as coal ash, slag or natural pozzolan. Decreasing the water demand can improve strength by decreasing the water-to-cement ratio for a given workability. The narrow PSD cements are well suited for making blended cements, including binary, ternary and quaternary blends.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROMAN CEMENT LLC1475 PRINCETON AVENUE SALT LAKE CITY UT 84105

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guynn, John M Salt Lake City, US 44 547
Hansen, Andrew S Bountiful, US 54 1234

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00