Multifunctional safety valve device with incorporated proportional pressure regulator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8550112
APP PUB NO 20100300553A1
SERIAL NO

12738996

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Multifunctional safety valve device with proportional pressure regulator, for line feeding aeriform fluid to a user, including a body defining a fluid or gas conduit connected to a gas feed line and a gas delivering line. The conduit has first and second passages intercepted by respective first and second valving elements. The second element downstream of the first for gas pressure regulating and modulating. The valving elements operated by electromagnetic actuators and urged closed at least by a spring. The second element cooperating with a membrane subjected to gas pressure to urge the second element closed. The membrane has, subjected to gas pressure, a surface larger than that of the second element subjected to the same pressure, to maintain the second element closed. The second element presenting, downstream of the second passage, a portion with a flexible rim arranged to seal the second passage when intercepted by the second element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BERTELLI & PARTNERS S R L37050 ANGIARI (VERONA)

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bertelli, Pierluigi Bardolino, IT 10 22

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 8, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00