Protective-control measuring system and device and data transmission method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8547201
SERIAL NO

13145120

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, when sending a transmission target main data 21, an authentication-tag generator unit 13 generates an authentication tag 23 by using a main data 21 and a key data 22 stored in a key-data storage unit 12. A transmitter/receiver unit 14 adds the authentication tag 23 to the main data 32 sends as a transmission data. When receiving the received data 24a, the transmitter/receiver unit 14 divides the received data into a main data 21a and an authentication tag 23a. The authentication-tag generator unit 13 generates an authentication tag 23b for comparison. A received-data authentication unit 15 determines whether or not those the received authentication tag 23a and the authentication tag for comparison 23b match with each other. A different key data is used every time upon the authentication-tag generation and use time of each key data during a set period is restricted.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOSHIBA ENERGY SYSTEMS & SOLUTIONS CORPORATION72-34 HORIKAWA-CHO SAIWAI-KU KAWASAKI-SHI KANAGAWA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukushima, Kazuto Aoba-ku, JP 3 14
Katayama, Shigeki Kiyose, JP 20 229
Matsumoto, Tsutomu Yokohama, JP 44 780
Sekiguchi, Katsuhiko Tama, JP 13 220

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00