Zirconium and hafnium boride alloy templates on silicon for nitride integration applications

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8545627
APP PUB NO 20110189838A1
SERIAL NO

13085115

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Semiconductor structures are provided comprising a substrate and a epitaxial layer formed over the substrate, wherein the epitaxial layer comprises B; and one or more element selected from the group consisting of Zr, Hf and Al and has a thickness greater than 50 nm. Further, methods for integrating Group III nitrides onto a substrate comprising, forming an epitaxial buffer layer of a diboride of Zr, Hf, Al, or mixtures thereof, over a substrate; and forming a Group III nitride layer over the buffer layer, are provided which serve to thermally decouple the buffer layer from the underlying substrate, thereby greatly reducing the strain induced in the semiconductor structures upon fabrication and/or operation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARIZONA BOARD OF REGENTS A BODY CORPORATE OF THE STATE OF ARIZONA ACTING FOR AND ON BEHALF OF ARIZONA STATE UNIVERSITY1475 NORTH SCOTTSDALE ROAD SKY SONG -- SUITE 200 SCOTTSDALE AS 85257-3538

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kouvetakis, John Mesa, US 33 3107
Roucka, Radek Tempe, US 29 683

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00