Agricultural implement with gauge wheel for a row unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8544516
APP PUB NO 20130032069A1
SERIAL NO

13591926

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An agricultural implement includes a tool bar and at least one row unit carried by the tool bar. Each row unit includes a furrow opener arrangement with a gauge wheel. The gauge wheel includes a rim with an outer periphery and a tire mounted to the outer periphery. The tire includes an outer shell formed from a first resilient material and an inner core formed from a softer second resilient material. The outer shell is positioned radially outward from the inner core and axial outward from axial ends of the inner core. The inner core is mounted directly on the outer periphery of the rim and defines an annular hollow core therein. The tire is structured and arranged such that the softer inner core, the annular hollow core and the harder outer shell coact to provide good wear, good shock absorbance, and good mud shedding capabilities.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DEERE & COMPANYONE JOHN DEERE PLACE MOLINE IL 61265 UNITED STATES OF AMERICA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aronova, Polina Port Byron, US 2 23
Cassidy, Scott DeForest, US 5 28
Mariman, Nathan A Geneseso, US 80 1867

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00