Construction system and method for multi-floor buildings

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8544238
APP PUB NO 20110289862A1
SERIAL NO

13147897

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A multi-floor building construction system for progressively constructing floors on load-bearing means of a foundation as the occupational need to do so arises and while sub-floors can be occupied. A permanent roof structure is displaceably supported over an uppermost floor of at least an upper one of one or more occupational floor spaces. Extensible load support means is secured in the roof structure until the completion of the mufti-floor building. The extensible load support means rests upon the uppermost floor to support the total load of the permanent roof structure. The extensible load support means is extendible downwardly to push against the uppermost floor to raise the permanent roof structure. Adjustable hoisting means is secured inside the permanent roof structure for lifting floor sub-assemblies fabricated in the construction zone using the extensible load support means while simultaneously raising the permanent roof structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • 3L-INNOGENIE INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Larouche, Gilles Mont-St-Hilaire, CA 5 36
Larouche, Joey Mont-St-Hilaire, CA 8 30
Larouche, Justin Mont-St-Hilaire, CA 3 33

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00