Method for making a composite material, composite material and end product

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8541090
APP PUB NO 20120321838A1
SERIAL NO

13522976

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is presented for making a composite material from strips comprising longitudinal fibers and a binder or resin, which material comprises a number of layer assemblies one on top of the other. Each layer assembly comprises m sets (with m at least 2) of parallel strips each extending in a different direction, Each layer assembly is manufactured by successive steps of depositing groups of parallel strips according to a well defined pattern (without longitudinally interweaving strips with previously deposited strips). Before completing a layer assembly, with the exception of the last layer assembly, by depositing its last group of parallel strips, the first group of parallel strips of the following layer assembly is already deposited. A composite material manufactured with such a method is presented too.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STICHTING NATIONAAL LUCHT- EN RUIMTEVAART LABORATORIUMANTHONY FOKKERWEG 2 AMSTERDAM 1059 CM

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gürdal, Zafer Delft, NL 1 6
Kassapoglou, Christos Den Hoorn, NL 4 56
Nagelsmit, Martin Herman Blokzijl, NL 1 6
Thuis, Hubertus Gerardus Stephanus Jozef Kraggenburg, NL 1 6
Wildvank, Willem Antonius Roy Dalfsen, NL 1 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00