Method for reducing air flow when operating a coal burner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8539891
APP PUB NO 20130025514A1
SERIAL NO

13632684

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An initial coal is cleaned to reduce ash content by ≧20% and yield refined coal that optimizes combustion air flow through a coal burner. This permits conveyance of pulverized refined coal in suspended condition through feeder pipes of the coal burner using reduced air flow compared to the quantity of air required to convey pulverized initial coal in suspended condition through the feeder pipes. This reduces oxygen in the primary combustion zone, lowering conversion of fuel nitrogen into NOx and instead converting it into N2 using the refined coal product. Reduced primary combustion air also reduces core flame temperature, reducing thermal NOx formation using the refined coal product. Increasing secondary and/or tertiary combustion air compensates for reduced primary combustion air and result in overall decrease in NOx formation (e.g., thermal NOx formation is reduced when combustion completed in cooler secondary and/or tertiary combustion zones).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HEADWATERS ENERGY SERVICES CORPORATION10653 SOUTH RIVERFRONT PARKWAY SUITE 300 SOUTH JORDAN UT 84095

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harding, N Stan North Salt Lake, US 2 1
Minkara, Rafic Kennesaw, US 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 24, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00