Fuel composition

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8536389
APP PUB NO 20130116487A1
SERIAL NO

13533124

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Unleaded blend composition having a Motor Octane Number (MON) of at least 80 having less than 42% of aromatic compounds, and at least 2% by volume of the total composition of component (a′), which is a substantially aliphatic hydrocarbon refinery stream of MON value of at least 85. At least 70% in total of the stream is branched chain alkanes, the stream being obtained by distillation from a refinery material as a cut having Initial Boiling Point of at least 15° C. and Final Boiling Point of at most 160° C. The Boiling Points are measured according to ASTMID2892. At least 5% of at least one paraffin, aromatic hydrocarbon compound or olefinic hydrocarbon has a bp 60-160° C., with not more than 5% of the total composition of hydrocarbon having a bp more than 160° C. Less than 5% 2,2,3-trimethylbutane or 2,2,3-trimethylpentane is present.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BP OIL INTERNATIONAL LIMITED1 FINSBURY CIRCUS LONDON EC2M 7BA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clark, Alisdair Quentin Puttenham Surrey, GB 14 355
Howard, Philip Berkshire, GB 18 478
Parker, Anthony George William Hook, GB 7 142

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 17, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00