Hybrid construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8532855
APP PUB NO 20110098873A1
SERIAL NO

13000032

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid construction machine includes an engine, a hydraulic pump configured to be driven by the engine, a hydraulic actuator configured to be driven with a hydraulic pressure from the hydraulic pump, an electric motor configured to assist the driving of the engine, and a generator configured to be driven by the engine to generate power. The number of revolutions of the engine is caused to vary in accordance with the size of a load on the engine. In response to a decrease in the load requested of the engine, the engine is decelerated by causing the generator to generate power. In response to an increase in the load requested of the engine, the engine is accelerated by assisting the engine by driving the electric motor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMITOMO HEAVY INDUSTRIES LTDTOKYO JAPAN TOKYO METROPOLIS
SUMITOMO(S H I) CONSTRUCTION MACHINERY CO LTD1-1 OSAKI 2-CHOME SHINAGAWA-KU TOKYO 141-6025

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Koga, Masato Kanagawa, JP 63 511
Kubo, Takashi Chiba, JP 267 2077
Osuka, Tadao Chiba, JP 1 37
Shono, Hiroso Kanagawa, JP 4 79

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00