Methods and systems for reroute and generation of backward routing information

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8532109
APP PUB NO 20110116506A1
SERIAL NO

12651346

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems for reroute and generation of backward routing information are provided. When an originator node wants to transmit a packet to a destination node and cannot transmit the packet to a next node recorded in a routing table, the originator node records a backward packet tag and information of the originator node into the packet, and transmits the edited packet to a backup node recorded in the routing table. The backup node retrieves a backward routing table in response to the backward packet tag to see whether a forwarding node corresponding to the originator node and the destination node is a backward routing terminal. If not, the backup node transmits the packet to the forwarding node. If so, the backup node removes the backward packet tag and the information of the originator node from the packet, and transmits the packet to the forwarding node.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INDUSTRIAL TECHNOLOGY RESEARCH INSTITUTE195 SEC 4 CHUNG HSING RD CHUTUNG HSINCHU 310401

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Su, Hui-Kai Chiayi County, TW 5 2
Wu, Cheng-Shong Chiayi County, TW 5 14
Yang, Ming-Ta Hsincu, TW 18 139

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00