Roll-to-roll non-vacuum deposition of transparent conductive electrodes

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8530262
APP PUB NO 20100003781A1
SERIAL NO

12396435

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and devices are provided for improved photovoltaic devices. Non-vacuum deposition of transparent conductive electrodes in a roll-to-roll manufacturing environment is disclosed. In one embodiment, a method is provided for forming a photovoltaic device. The method comprises processing a precursor layer in one or more steps to form a photovoltaic absorber layer; depositing a smoothing layer to fill gaps and depression in the absorber layer to reduce a roughness of the absorber layer; adding an insulating layer over the smooth layer; and forming a web-like layer of conductive material over the insulating layer. By way of nonlimiting example, the web-like layer of conductive material comprises a plurality of carbon nanotubes. In some embodiments, the absorber layer is a group IB-IIIA-VIA absorber layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AERIS CAPITAL SUSTAINABLE IP LTDP O BOX 715 C/O AVALON MANAGEMENT LIMITED LANDMARK SQUARE 1ST FLOOR 64 EARTH CLOSE GRAND CAYMAN KY1-1107

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Robinson, Matthew R San Jose, US 74 2573
Sheats, James R Palo Alto, US 44 1570
Van, Duren Jeroen K J San Francisco, US 32 999

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00