Head centering jig for femoral resurfacing

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8529572
APP PUB NO 20100152742A1
SERIAL NO

12715200

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is described a jig for identifying a point on the femoral head which is in alignment with a central axis of the femoral neck. The jig comprises a first member which defines a plane and has means for at least partially receiving the femoral neck. The jig also comprises a guide member which is mounted apart from the first member and which defines an axis at right angles to the plane defined by the first member. The axis of the guide member intersects the plane at a point which is a predetermined distance away from the means receiving the femoral neck. In addition, the jig comprises an elongate alignment means which is mounted with respect to the first member and which is spaced apart from, but extends parallel to, the axis of the guide member. There is also described a kit for use in the resurfacing of the femoral head. The kit comprises at least one jig as previously described.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CORIN LIMITEDTHE CORINIUM CENTRE CIRENCESTER GLOUCESTERSHIRE GL7 1YJ

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bishay, Michael Bath, GB 2 56
Krikler, Steven J Coventry, GB 1 37
Nevelös, James Chippenham, GB 2 47
Stachniw, Myron B Galesburg, US 2 56

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00