Power plant for IGSC-process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8528342
APP PUB NO 20100236254A1
SERIAL NO

12728416

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power plant has a coal gasification device for gasifying coal, particularly with water injection, a gas combustion device, particularly a CES burner, for combusting synthesis gas, particularly purified synthesis gas, from the coal gasification device, a hot gas expander for generating usable output power by expansion of flue gas from the gas combustion device, a steam generator, particularly a waste heat steam generator, for heating, particularly for evaporating and/or superheating, feedwater through exhaust heat of the expanded flue gas, a steam turbine set with at least a first stage for expanding steam, particularly high-pressure steam, from the steam generator, and a reheater which is arranged after the first stage of the steam turbine set and through which expanded flue gas flows. In this power plant, the cold rail of the reheater is throttled by a throttle device for constant pressure operation on the high-pressure side, and the steam parameters for the cold reheater rail are achieved by a conditioning valve for sliding pressure operation on the high-pressure side.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MAN DIESEL & TURBO SEAUGSBURG GERMANY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gericke, Bernd Cologne, DE 5 86

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00