Mn-Zn-Co ferrite core and method for producing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8518289
APP PUB NO 20110279216A1
SERIAL NO

13146830

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Mn—Zn—Co ferrite core includes a basic component, sub-components, and unavoidable impurities. As the sub-components, silicon oxide (in terms of SiO2): 50-400 mass ppm and calcium oxide (in terms of CaO): 1000-4000 mass ppm are added to the basic component consisting of iron oxide (in terms of Fe2O3): 51.0-53.0 mol %, zinc oxide (in terms of ZnO): more than 12.0 mol % and 18.0 mol % or less, cobalt oxide (in terms of CoO): 0.04-0.60 mol %, and manganese oxide (in terms of MnO): balance; Phosphorus, boron, sulfur, and chlorine in the unavoidable impurities are reduced as follows, phosphorus: less than 3 mass ppm, boron: less than 3 mass ppm, sulfur: less than 5 mass ppm, and chlorine: less than 10 mass ppm; and a ratio of a measured specific surface of the Mn—Zn—Co ferrite core to an ideal specific surface of the Mn—Zn—Co ferrite core satisfies: Measured specific surface/ideal specific surface <1500.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
JFE CHEMICAL CORPORATION17-4 KURAMAE 2-CHOME TAITO-KU TOKYO 111-0051

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Goto, Satoshi Okayama, JP 118 795
Nakamura, Yukiko Chiba, JP 21 64
Yoshida, Hirofumi Chiba, JP 61 480

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00