Metal separation using a tunnel kiln furnace

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8518147
APP PUB NO 20120024111A1
SERIAL NO

12844431

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of separating metals that are physically or structurally combined in assemblies which includes the steps of: providing at least one assembly that comprises two or more different metals that are physically or structurally combined; heating the at least one assembly in a tunnel kiln furnace to melt at least one of the different metals while maintaining at least one of the different metals in a solid state; and separating the at least one of the different metals that was melted from the at least one of the different metals that was maintained in the solid state. According to one embodiment the assemblies are “copper meatballs.” Also disclosed is a system for separating metals that are physically or structurally combined in assemblies which system includes a tunnel kiln furnace and processing containers or processing containment assemblies into or onto which the assemblies are loaded and transported through the tunnel kiln furnace in.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HERITAGE RESEARCH GROUP5400 WEST 86TH ST INDIANAPOLIS IN 46268

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bratina, James E Greenwood, US 14 55
Kriech, Anthony Indianapolis, US 4 80
Wilson, Shannon Indianapolis, US 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00