Assembling structure of clip and mounting member

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8511631
APP PUB NO 20090218464A1
SERIAL NO

12379168

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to an aspect of the present invention, there is provided an assembling structure including: a mounting member having a mounting seat; and a clip having a head and a leg. The head includes: a neck portion; and first and second flanges outwardly protrudes therefrom to sandwich the mounting seat therebetween, wherein the mounting seat includes: a hole having a diameter larger than that of the neck portion; a groove formed to communicate the hole with outside the mounting seat; and a projection protruding from a peripheral edge of the hole, wherein the second flange includes: an inner face radially-outwardly extending therefrom to gradually come close to the first flange; a top portion; and an outer face further extending to gradually separate from the first flange, and wherein the inner face abuts the projection in an assembled state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PIOLAX INC7TH FLOOR YOKOHAMA HANASAKI BLDG 6-145 HANASAKI-CHO NISHI-KU YOKOHAMA-SHI KANAGAWA 2200022

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kato, Kouichi Kanagawa, JP 42 307
Nakazato, Hiroshi Kanagawa, JP 59 1014
Shinozaki, Nobuya Kanagawa, JP 14 362

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00