Method for manufacturing fine-pitch bumps and structure thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8501614
SERIAL NO

13426810

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for manufacturing fine-pitch bumps comprises the steps of providing a silicon substrate; forming a titanium-containing metal layer on the silicon substrate, wherein the titanium-containing metal layer comprises a plurality of first zones and a plurality of second zones; forming a photoresist layer on the titanium-containing metal layer; patterning the photoresist layer to form a plurality of opening slots; forming a plurality of copper bumps at the opening slots, wherein each of the copper bumps comprises a first top surface and a ring surface; heating the photoresist layer to form a plurality of body portions and a plurality of removable portions; etching the photoresist layer; and removing the second zones to enable each of the first zones to form an under bump metallurgy layer having a bearing portion and an extending portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHIPBOND TECHNOLOGY CORPORATIONNO 3 LIHSIN 5 RD HSINCHU SCIENCE PARK HSINCHU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dai, Hua-An Kaohsiung, TW 5 16
Hsieh, Yung-Wei Hsinchu, TW 15 41
Lin, Cheng-Fan Hsinchu County, TW 12 23
Lin, Shu-Chen Pingtung County, TW 97 955
Shih, Cheng-Hung Changhua County, TW 46 85

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00