Systems and method for igniting explosives

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8499675
SERIAL NO

13363071

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods are presented herein that provide for ignition of explosive devices through electric and/or electromagnetic discharge. In one embodiment, an electrostatic discharge is directionally propagated through air to conduct electric current to the explosive device. The electric current may ignite the explosive device via heat, via triggering of ignition circuitry, via induced electric current conduction to the explosive material therein and/or via direct electric conduction to the explosive material therein. Alternatively, or in addition to, electromagnetic energy may be directionally propagated to the device through a waveguide. Such electromagnetic energy may be in the microwave region and may heat and/or induce electric current in the explosive device. In either instance, the directionally propagated energy may be time varying. In one embodiment, a system is configured with a vehicle to distally position the directionally propagated energy to the explosive device such that damage caused by the device is inhibited.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
APPLIED ENERGETICS INC9070 SOUTH RITA ROAD SUITE 1500 TUCSON AS 98747

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Adler, Richard J Marana, US 20 428
Hayden, Joseph C Tucson, US 4 58
Lau, Eric Tucson, US 42 202
Lundquis, Paul B Vail, US 1 7
McCahon, Stephen Tucson, US 3 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00