Insulating film material, method of film formation using insulating film material, and insulating film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8497391
APP PUB NO 20110130584A1
SERIAL NO

12864127

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An insulating film material for plasma CVD represented by a chemical formula (1) shown below, a method of film formation using the insulating film material, and an insulating film. According to the present invention, an insulating film having a low dielectric constant and a superior copper diffusion barrier property suitable for an interlayer insulating film or the like of a semiconductor device can be obtained. In the chemical formula (1), n represents an integer of 3 to 6, and each of R1 and R2 independently represents one of C2H, C2H3, C3H3, C3H5, C3H7, C4H5, C4H7, C4H9, C5H7, C5H9 and C5H11.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NATIONAL INSTITUTE FOR MATERIALS SCIENCE2-1 SENGEN 1-CHOME TSUKUBA-SHI IBARAKI 305-0047
TAIYO NIPPON SANSO CORPORATIONSHINAGAWA-KU TOKYO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hasaka, Satoshi Oyama, JP 8 429
Inaishi, Yoshiaki Kawasaki, JP 4 119
Inoue, Minoru Tokyo, JP 46 844
Miyazawa, Kazuhiro Yokohama, JP 26 213
Ohno, Takahisa Tsukuba, JP 7 27
Sakoda, Kaoru Yokohama, JP 4 29
Shinriki, Manabu Kawaguchi, JP 10 770
Tajima, Nobuo Tsukuba, JP 12 144

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 30, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00