Method of manufacturing multilayer ceramic substrates

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8496770
APP PUB NO 20120061002A1
SERIAL NO

13321939

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a method of manufacturing a multilayer ceramic substrate, first and second sheet stacks are formed by pressurizing a plurality of unsintered ceramic sheets, respectively. A hole is formed to penetrate through the second sheet stack. A third preliminary sheet stack is formed by positioning the second sheet stack on the first sheet stack. First and second thin films are formed at top and bottom of the third preliminary sheet stack, respectively. A third sheet stack is formed by pressurizing the first and the second thin films and the third preliminary sheet stack. The first and the second thin films are removed from the third sheet stack, thereby forming a preliminary multilayer ceramic substrate. The preliminary multilayer ceramic substrate is sintered. Accordingly, the reliability and stability of the manufacturing process for the multilayer ceramic substrate is sufficiently improved with reduced cost due to the flat molds and thin films.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICO CERAMICS LTD100 GONGDAN-RO ANSEONG-SI GYEONGGI-DO 17567

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Won-Mook Gyeonggi-do, KR 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 30, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00