Solid state imaging device having high sensitivity and high pixel density

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8487357
APP PUB NO 20110220969A1
SERIAL NO

13046113

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Each pixel of a solid state imaging device comprises: a first semiconductor layer; a second semiconductor layer; a third semiconductor layer and fourth semiconductor layer formed on the lateral side of the upper region of the second layer not to be in contact with the top surface of the second semiconductor layer; a gate conductor layer formed on the lower side of the second semiconductor layer; a conductor electrode formed on the side of the fourth semiconductor layer via an insulating film; and a fifth semiconductor layer formed on the top surface of the second semiconductor layer, wherein at least the third semiconductor layer, upper region of the second semiconductor layer, fourth semiconductor layer, and fifth semiconductor layer are formed in the shape of an island. A specific voltage is applied to the conductor electrode to accumulate holes in the surface region of the fourth semiconductor layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
UNISANTIS ELECTRONICS SINGAPORE PTE LTDSINGAPORE 179098

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harada, Nozomu Tokyo, JP 261 1653
Masuoka, Fujio Tokyo, JP 412 6771

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00