Structure and process for electrical interconnect and thermal management

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8486765
APP PUB NO 20120048596A1
SERIAL NO

13238975

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for making a structure for thermal management of circuit devices. The method provides a first substrate and a second substrate where at least one of the first and second substrates includes a circuit element. The method forms in at least one of the first substrate and the second substrate an entrance through-hole extending through a thickness of the first substrate or the second substrate, forms in at least one of the first substrate and the second substrate an exit through-hole extending through a thickness of the first substrate or the second substrate, forms respective bonding elements on at least one of the first and second substrates, and bonds the first and second substrates at the respective bonding elements to form a seal between the first and second substrates and to form a first coolant channel in between the first and second substrates.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MICROSS ADVANCED INTERCONNECT TECHNOLOGY LLC3021 E CORNWALLIS ROAD DURHAM NC 27709

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bower, Christopher A Raleigh, US 11 369
Garrou, Philip Cary, US 4 390
Williams, Charles Kenneth Raleigh, US 6 300

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00