Method of manufacturing a heat conducting structure having a coplanar heated portion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8484845
APP PUB NO 20110067846A1
SERIAL NO

12562352

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heat conducting structure, a heat sink with the heat conducting structure, and a manufacturing method of the heat conducting structure are disclosed. The manufacturing method includes the steps of providing a first mold (20) and a second mold (30) having different concave cambers (211, 211a, 221, 221a), using the first mold (20) to progressively compress the heat pipes (10) and form a camber (112) at an evaporating section (11), using the second mold (30) to compress the camber (112) to form a contact plane (112′) and an attaching plane (113′) perpendicular to each other, coating an adhesive (50) on the contact planes (112′), connecting the contact planes to make the attaching planes co-planar.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GOLDEN SUN NEWS TECHNIQUES CO LTDNO 60 WUCHIUAN RD WUGU HSIANG TAIPEI HSIEN
CPUMATE INCTAIPEI COUNTY 248

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Chih-Hung Wugu Township, Taipei County, TW 88 1047
Hsu, Ken Wugu Township, Taipei County, TW 62 938
Lin, Chen-Hsiang Wugu Township, Taipei County, TW 68 721
Lin, Kuo-Len Wugu Township, Taipei County, TW 77 897

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00