Distributed priority queue that maintains item locality

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8484651
APP PUB NO 20080276241A1
SERIAL NO

12115031

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of administering a distributed priority queue structure that includes removing a highest priority item from a current root node of a tree structure to create a temporary root node, determining for each subtree connected to the temporary root node a subtree priority comprising the priority of the highest priority data item in the each subtree, determining as the highest priority subtree connected to the temporary root node the subtree connected to the temporary root node having the highest subtree priority, determining whether any of the one or more data items stored at the temporary root node has a higher priority than the highest subtree priority and directing an arrow to the subtree having the highest priority or to the temporary root itself if the priority of the data items stored at temporary root is higher than the priorities of the connected subtrees.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AVAYA LLC1209 ORANGE STREET WILMINGTON DE 19801

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bajpai, Ratan Mt. Laurel, US 3 135
Dhara, Krishna Kishore Dayton, US 34 801
Krishnaswamy, Venkatesh Holmdel, US 76 1748

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00