Soft-start systems and methods for vehicle starters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8476997
APP PUB NO 20120139677A1
SERIAL NO

13224535

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Soft-start systems and methods for vehicle starters are provided. Embodiments provide a solenoid including: a first coil that receives power when an ignition switch is closed; a first plunger actuated when the first coil receives power; a first terminal configured to be abutted by a contact bar of the first plunger; a second coil that receives power when the contact bar of the first plunger abuts the first terminal; a second plunger actuated when the second coil receives power; and a second terminal configured to be abutted by a contact bar of the second plunger. Such a solenoid is configured to provide power at a first level to an attached motor when the contact bar of the first plunger abuts the first terminal and at a second level that is higher than the first level when the contact bar of the second plunger abuts the second terminal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PRESTOLITE ELECTRIC INC2100 COMMONWEALTH BLVD SUITE 300 ANN ARBOR MI 48105

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hall, Robert David Berkey, US 4 9
Harley, Clive Ann Arbor, US 2 4
Hrnjak, Aleksandar Windsor, CA 4 91
Plenzler, James David Toledo, US 2 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00