Method for evaluating metal contamination of silicon single crystal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8475589
APP PUB NO 20090255456A1
SERIAL NO

12385386

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When a silicon single crystal is grown by the CZ method using a pulling apparatus in which a voltage can be applied between a crystal suspending member and a crucible, the voltage is applied under the condition that the crystal suspending member is set as a negative electrode while the crucible is set as a positive electrode in a process for growing a lower end portion of a cylindrical portion or a tail portion which is of a non-convertible portion of the silicon single crystal. A sample wafer is collected from the lower end portion of the cylindrical portion or the tail portion, which is grown in association with the voltage application, and the metal contamination of the sample wafer is evaluated. The sample wafer has enough metal impurity concentration to evaluate the metal contamination. The metal contamination is evaluated for each of the sequentially grown silicon single crystals, so that a metal impurity generation behavior in a pulling apparatus, which is a factor in silicon single crystal metal contamination, can assuredly be grasped.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SUMCO CORPORATION2-1 SHIBAURA 1-CHOME MINATO-KU TOKYO 1058634 ?1058634

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuragaki, Shunji Tokyo, JP 7 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 2, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00