Power conversion circuit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8471409
APP PUB NO 20120170336A1
SERIAL NO

13036406

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention discloses a power conversion circuit. A control module controls a pulse width modulation regulator to regulate a duty cycle of a DC-DC converter according to the direct current link voltage of the DC-DC converter and the output current and voltage of a renewable power supply. The control module also controls the pulse width modulation regulator to regulate a duty cycle of a DC-AC inverter according to the direct current link voltage of the DC-DC converter, output voltage of a utility power supply, and the output current and voltage of the renewable power supply.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHUNG-HSIN ELECTRIC AND MACHINERY MANUFACTURING CORP3F NO 801 JHONGJHENG RD JHONGHE CITY TAIPEI COUNTY TAIWAN 23552

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Jin-Ming Kwei Shan Township, Taoyuan County, TW 7 12
Chou, Chen-Kun Kwei Shan Township, Taoyuan County, TW 7 10
Lin, Zhan-Yi Kwei Shan Township, Taoyuan County, TW 7 10
Sun, Yu-Ming Kwei Shan Township, Taoyuan County, TW 24 76
Wu, Chi-Bin Kwei Shan Township, Taoyuan County, TW 45 126

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00