Method for configuring installation capacities of hybrid energy generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8458101
APP PUB NO 20110295610A1
SERIAL NO

12869003

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for installation capacities of a hybrid energy generation system is disclosed. The hybrid energy generation system may include a plurality of power systems. According to the environment factors and practical requirements of the installation site, the mechanism of the present invention may find the golden ratio of the installation capacities among the different power systems. Furthermore, the present invention may obtain the combination of installation capacities associated with the minimum recovery period, thereby further decreasing the installation cost and the efficiency of the hybrid energy generation system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YUAN ZE UNIVERSITYTAOYUAN
TAIWAN GREEN PRODUCTIVITY FOUNDATION5F NO 48 BAOQIAO RD XINDIAN CITY TAIPEI COUNTY 231 R O C
ADVANCED CONTROL & SYSTEMS INC5F NO 52 SEC 3 NANGANG RD NANGANG DISTRICT TAIPEI CITY 115 R O C
CHINA TECHNICAL CONSULTANTS INC FOUNDATION8F NO 97 SEC 2 DUNHUA S RD DA-AN DIST TAIPEI CITY 106 ROC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Yu-Chang Taoyuan County, TW 19 98
Chen, Yi-Chang Hsinchu, TW 76 696
Huang, Li-Ning Taipei, TW 1 6
Lin, Charng-Gen Taipei, TW 1 6
Wei, Jung-Tzung Tainan County, TW 7 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00