Induction welded waterproofing
Number of patents in Portfolio can not be more than 2000
United States of America Patent
Stats
-
Jun 4, 2013
Grant Date -
Jun 21, 2012
app pub date -
Nov 8, 2011
filing date -
Nov 8, 2010
priority date (Note) -
In Force
status (Latency Note)
![]() |
A preliminary load of PAIR data current through [] has been loaded. Any more recent PAIR data will be loaded within twenty-four hours. |
PAIR data current through []
A preliminary load of cached data will be loaded soon.
Any more recent PAIR data will be loaded within twenty-four hours.
![]() |
Next PAIR Update Scheduled on [ ] |

Importance

US Family Size
|
Non-US Coverage
|
Patent Longevity
|
Forward Citations
|
Abstract
In accordance with an embodiment of the disclosure, A water-proofing laminate includes a drainboard having a first surface positioned against a hydraulic source and a second surface opposed to the first surface, a fastener plate positioned against the second surface of the drainboard securing the drainboard to the hydraulic surface, the fastener plate comprising a conductive element and a thermoplastic resin, and a self-healing hydraulic barrier comprising a thermoplastic surface adjoined to a geotextile and carrying a water-absorbent material, the thermoplastic surface inductively welded to the fastener plate.
First Claim
all claims..Other Claims data not available
Family

- 15 United States
- 10 France
- 8 Japan
- 7 China
- 5 Korea
- 2 Other
Patent Owner(s)
Patent Owner | Address | |
---|---|---|
AMCOL INTERNATIONAL CORPORATION | 1500 WEST SHURE DRIVE ARLINGTON HEIGHTS IL 60004 |
International Classification(s)
Inventor(s)
Inventor Name | Address | # of filed Patents | Total Citations |
---|---|---|---|
Cisneros, Robert | Marengo, US | 2 | 14 |
# of filed Patents : 2 Total Citations : 14 |
Cited Art Landscape
- No Cited Art to Display

Patent Citation Ranking
Forward Cite Landscape
- No Forward Cites to Display

Maintenance Fees
Fee | Large entity fee | small entity fee | micro entity fee | due date |
---|---|---|---|---|
11.5 Year Payment | $7400.00 | $3700.00 | $1850.00 | Dec 4, 2024 |
Fee | Large entity fee | small entity fee | micro entity fee |
---|---|---|---|
Surcharge - 11.5 year - Late payment within 6 months | $160.00 | $80.00 | $40.00 |
Surcharge after expiration - Late payment is unavoidable | $700.00 | $350.00 | $175.00 |
Surcharge after expiration - Late payment is unintentional | $1,640.00 | $820.00 | $410.00 |
Full Text

Legal Events
- No Legal Status data available.

Matter Detail

Renewals Detail
