Method of controlling chemical in wet decarburinozation of fly ash

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8454745
APP PUB NO 20110036271A1
SERIAL NO

12922645

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To reduce cost of chemical by reducing quantity of foaming agent used when removing unburned carbon in fly ash with wet floatation and to prevent decrease in activity index of the fly ash. In wet decarburization of fly ash, the solution comprising the steps of: adding water to fly ash to generate slurry; adding hydrophobizing agent and foaming agent to the slurry and agitating them to generate bubbles; and adhering unburned carbon in the fly ash to the bubbles to float them to remove the unburned carbon in the fly ash, when sedimentation component at wet floatation separation is solid-liquid separated and liquid phase obtained by solid-liquid separation is reused for another floatation separation for new fly ash, the quantity of foaming agent added to the slurry is adjusted such that concentration of the foaming agent in liquid phase is in a predetermined range. When adjusting the concentration of the foaming agent in the liquid phase, it is possible to measure COD concentration in the liquid phase and adjust the quantity of the foaming agent added to the slurry in such a manner that the COD concentration is in a predetermined range.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TAIHEIYO CEMENT CORPORATION1-1-1 KOISHIKAWA BUNKYO-KU TOKYO 112-8503
MITSUI ENGINEERING AND SHIPBUILDING CO LTDTOKYO 104

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsuo, Kazuyoshi Ichihara, JP 23 150
Nakamura, Tomomichi Kumagaya, JP 16 128
Suzuki, Takao Chuo-ku, JP 269 3417

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00