Suspension arm unit for vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8454041
APP PUB NO 20120018973A1
SERIAL NO

13051485

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A suspension arm unit for vehicle includes: a pair of profile beams each having a U-shaped cross section with an opening oriented in a horizontal direction and including: a base end part formed on one end side of the profile beam and vertically swingably supported on a vehicle body side about an axis extending in a front-rear direction; and a distal end part formed on the other end side, to which a knuckle arm unit of a wheel is attached. The pair of the profile beams are arranged in the front-rear direction so that the openings face each other in the front-rear direction and a gap between the profile beams becomes larger from the distal end part to the base end part, and the pair of the profile beams are connected to each other at the distal end part and to the knuckle arm unit through a rotary joint.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KUBOTA CORPORATION2-47 SHIKITSUHIGASHI 1-CHOME NANIWA-KU OSAKA OSAKA-SHI 5568601

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujii,, Takashi Sakai, JP 10 17
Hamamura,, Kyouhei Sakai, JP 1 15
Kawamura,, Shoichiro Hannan, JP 1 15
Nishimura,, Yuhei Sakai, JP 1 15
Saji,, Shinichiro Sakai, JP 1 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00