Gas-discharge lamp controller utilizing a novel preheating phase control mechanism

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8450940
APP PUB NO 20110285322A1
SERIAL NO

12784039

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gas-discharge lamp controller utilizing a novel preheating phase control mechanism, having: a supply voltage tracking reference voltages generator, biased between a supply voltage and a reference ground, for generating a first reference voltage which is proportional to the supply voltage; and a control unit, for generating a high threshold signal according to the first reference voltage and a saw-tooth signal, the peak value of the saw-tooth signal being proportional to the supply voltage, wherein the control unit has a preheating phase, the high threshold signal is coupled with the first reference voltage during the preheating phase, and the time duration of the preheating phase is set by a predetermined number of periods of the saw-tooth signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NANJING GREENCHIP SEMICONDUCTOR CO LTDNO 12 BLDG NO 29 BU YUE RD PUKOU DIST ROOM 245 NANJING

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Pei-Yuan Taipei County, TW 24 149
Lin, Ko-Ming Tainan, TW 13 55
Wang, Yen-Ping Taipei, TW 89 452

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00