Process for cooling the stream leaving an ethylbenzene dehydrogenation reactor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8450547
APP PUB NO 20110065971A1
SERIAL NO

12744683

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is a process for the production of styrene monomer from ethylbenzene comprising the steps of:

    a) catalytically dehydrogenating said ethylbenzene in the presence of steam thereby catalytically producing a dehydrogenation effluent gas containing essentially unreacted ethylbenzene, styrene monomer, hydrogen, steam and divinylbenzene;b) quenching said effluent gas with an aqueous reflux in at least a quenching column to cool said effluent gas, and thereby obtaining a gas at the overhead and in the bottom a liquid stream warmer than the aqueous reflux;c) condensing said overhead gas thereby producing a liquid organic phase, an aqueous phase and a gaseous phase;d) using a portion or the whole of said aqueous phase of step c) as reflux for said step b) of quenching;e) sending to a decanter the liquid stream obtained at step b) to recover an aqueous phase and an organic phase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOTAL PETROCHEMICALS FRANCE4/8 COURS MICHELET F-92800 PUTEAUX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dernoncourt, Renaud Brussels, BE 3 0
Thoret, Bauchet Jean-Pierre Brussels, BE 15 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00