Method and apparatus for treating a cellulosic feedstock

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8449680
APP PUB NO 20100024808A1
SERIAL NO

12181666

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and apparatus for pre-treating a cellulosic feedstock are disclosed. Embodiments of the method comprise conveying the cellulosic feedstock through an enclosed volume, adding moisture to the cellulosic feedstock simultaneously at multiple spaced-apart moisture injection points as the cellulosic feedstock travels through the volume, and heating the cellulosic feedstock as it travels through the volume to obtain a heated moistened feedstock. Embodiments of the apparatus comprise a shell defining a treatment chamber having a lower inner surface. The treatment chamber has an inlet and an outlet spaced longitudinally apart from the inlet to define an axial length. A conveyance member is housed within the shell and is configured to sweep the lower inner surface. A plurality of injection ports are provided in at least one of the shell and the conveyance member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABENGOA BIOENERGY NEW TECHNOLOGIES LLC16150 MAIN CIRCLE DRIVE SUITE 300 CHESTERFIELD MO 63017

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Burke, Murray J Oakville, CA 15 206
Hillier, Sunalie N Georgetown, CA 10 162

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00