Method of manufacturing a piezoelectric vibrator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8448311
APP PUB NO 20100313399A1
SERIAL NO

12860570

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

When a base substrate where through electrodes are formed is anodically bonded to a lid substrate that includes a bonding film formed on the entire lower surface thereof, a method of manufacturing a piezoelectric vibrator includes a superimposing process for superimposing the lid substrate on the base substrate so that a piezoelectric vibrating reed is received in a cavity, after bonding the piezoelectric vibrating reed to the upper surface of the base substrate; a setting process for placing a dummy member, which is made of a material in which ions can be transferred at a bonding temperature, on an electrode plate, and placing the superimposed substrates on the dummy member so that the base substrate faces the dummy member; and an applying process for applying a bonding voltage between the electrode plate and the bonding film after heating the dummy member and the substrates up to the bonding temperature.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SII CRYSTAL TECHNOLOGY INCCHIBA COUNTY CHIBA JAPAN CHIBA-SHI CHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Aratake, Kiyoshi Chiba, JP 43 340
Kawada, Yasuo Chiba, JP 29 507

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00