Multicomponent molding with polyester layers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8445107
APP PUB NO 20080211135A1
SERIAL NO

11917487

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Process for production of multicomponent moldings, which comprises producing a molding of which at least one layer is composed of a thermoplastic molding composition composed of

    A) from 10 to 99.99% by weight of at least one thermoplastic polyester,B) from 0.01 to 50% by weight ofB1) at least one highly branched or hyperbranched polycarbonate having an OH number of from 1 to 600 mg KOH/g of polycarbonate (to DIN 53240, Part 2), orB2) at least one highly branched or hyperbranched polyester of AxBy type, where x is at least 1.1 and y is at least 2.1, or a mixture of these, andC) from 0 to 60% by weight of other additives,where the total of the percentages by weight of components A) to C) is 100%.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BASF AKTIENGESELLSCHAFTLUDWIGSHAFEN 67056

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bruchmann, Bernd Freinsheim, DE 258 2486
Eipper, Andreas Ludwigshafen, DE 40 387
Ginss, Christophe Wolxheim, FR 8 57
Hofli, Kurt Ludwigshafen, DE 2 20
Rosenau, Bernhard Neustadt, DE 25 117
Voelkel, Mark Ladenburg, DE 2 1
Weiss, Carsten Singapore, SG 46 205

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00