Superconducting oscillator

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8437816
APP PUB NO 20120010083A1
SERIAL NO

13171062

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An oscillator and method for applying a time-varying force to a magnet is provided. The oscillator includes a superconductor material at a temperature. The superconductor material is in a superconducting state in the presence of an external magnetic field below a critical field strength, wherein the critical field strength is a function of the temperature of the superconductor material. The oscillator further includes at least one magnetic field source configured to apply a magnetic field having a time-varying field strength to the superconductor material. The time-varying field strength cycles between at least a first field strength below the critical field strength for the superconductor material at the temperature and at least a second field strength above the critical field strength for the superconductor material at the temperature, such that the superconductor material cycles between a superconducting state and a non-superconducting state.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VAUCHER AEROSPACE CORPORATION18101 VON KARMAN AVENUE THIRD FLOOR IRVINE CA 92612

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Vaucher, Alexander R Chino Hills, US 7 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 7, 2024
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00